Fire Pump System Pre-Commissioning Checklist

Please fill out the below form and return to General Pump Company 48 hours prior to the day of commissioning. A technician will not be sent to site until the below checklist has been completed.

If the site is not ready for commissioning and the below points have not been checked, a futile commission fee of $380.00 + GST will be charged. Any additional works, time and components required to rectify incomplete installation will be charged accordingly

* must complete

Please enable JavaScript in your browser to complete this form.
Company or Consumer

Dear Client,
Please read all sections carefully!
Please find attached Commissioning Checklist please fill this in and return it to us 48hrs prior to the day of the commissioning. The Checklist is an important part of the commissioning process as it gives you the installer the details of what you need to have completed for the commissioning to be finished successfully and lets us know that the site is ready to be commissioned.

Please note that we are advising all customers that a technician will not be sent to the commissioning site until the Check List has been returned.
Note: A qualified electrical contractor should be engaged to confirm answers to questions below.

If the site is not ready for the commissioning as nominated by you on the commissioning checklist, a minimum charge of $380.00 + GST will be invoiced to cover lost time, wages, travel +vehicle expenses, and the re-organisation of other works for the Technician for that day. This is not negotiable. This charge will be additional to the original quoted commissioning charges. If the commissioning is required in a regional area all costs will be passed on by General Pump Company. Should you request that General Pump Company Technician(s) remain onsite to perform all works possible in the event that the site isn't ready for commissioning, charges will be forwarded at the applicable General Pump Company hourly rates in addition to the original commissioning charge. Please also note that bookings require a 5-day minimum notification.

To help you and your client General Pump Company can provide you with a pre-commissioning inspection for $195.00 + GST (City Metro) to ensure that you are ready for commissioning. Please call our Office on 1300 662 787 to secure a pre-commissioning inspection.

Notes:
General Pump Company allows up to1 hour for site inductions only. Additional time will be charged in accordance with the applicable General Pump Company's labour rates.

Only signed commissioning forms will be processed.

The following works must be completed before we can visit the site to commission your Hydrant Pump System.

Pumpset bolted to plinth using under base anti-vibration mounts.
Jacking pump bolted to floor/plinth
Flexible hose to be connected from jacking suction to dropper nipple located below suction pressure gauge. Flexible hose connected from jacking discharge to the dropper nipple located below the discharge pressure gauge. Pressure tank fitted to jacking discharge.
Electrical power supply is connected to jacking pump control panel. Under no circumstances should the jacking pump be energized before the commissioning serviceman is present.
Check adequate water supply is connected and turned on to the pump
All waste points from ball valves are plumbed to drain.
Engine cooling heat exchanger waste connection is plumbed to waste using a dedicated pipe.
Check adequate power supply is live and connected to the diesel hydrant control panel. Under no circumstances should the system be energized before the commissioning serviceman is present.
Exhaust muffler is fitted to the engine, and the exhaust pipe is piped to atmosphere. Exhaust pipe size should be determined by engine manufacturer and as per guide in AS2941-2013
The muffler and exhaust pipe has been lagged to prevent injury to service personnel.
Diesel fuel tank is full.
Photo of hydrant pump returned with this form.

N.B: Any operation of pump sets prior to site commissioning will void warranty

The pumpset is now ready to commission.